Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Magnitude 5.4 quake hits Gilgit-Baltistan near Sost

    August 14, 2026

    South Korea car exports set July high at $6.24 billion

    August 14, 2026

    Total eclipse tracks across Russia, Iceland and Spain

    August 13, 2026
    Jewish SentinelJewish Sentinel
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Jewish SentinelJewish Sentinel
    Home » Huasun Delivers 1.8 GW of HJT Modules within 3 Months for Massive Solar Project in Northwest China
    PR Newswire

    Huasun Delivers 1.8 GW of HJT Modules within 3 Months for Massive Solar Project in Northwest China

    September 5, 2024
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email

    XUANCHENG, China, Sept. 5, 2024 /PRNewswire/ — Huasun Energy has achieved a significant milestone in its path to bring heterojunction (HJT) solar modules to the mainstream in utility-scale photovoltaic plants. The company has successfully produced and delivered 1.8 GW HJT modules for the China Green Development Investment Group (CGDG) within a remarkable three-month timeframe since May 2024.

    Huasun has delivered 1.8 GW of high-efficiency HJT solar panels to CGDG in just three months for its 4 GW photovoltaic project in Northwest China. (Photo Credit: cSCEc)

    These modules are destined for CGDG’s ambitious 4 GW PV project in Ruoqiang, Xinjiang, China. With this shipment, Huasun has now supplied its cutting-edge modules to the two largest single-site heterojunction solar projects in the world. As the largest HJT manufacturer, the company has supplied 7 GW of HJT products to over 40 countries worldwide. Notably, Huasun has delivered over 650 MW to Bulgaria’s esteemed EPC company INERCOM for its HJT projects in the country.

    Located on the edge of the Taklamakan Desert in northwestern China, the Ruoqiang project not only represents a significant technological advancement but also delivers substantial ecological and social benefits. Covering approximately 9,688 acres, the panels help reduce ground temperatures and regulate the thermal balance of the desert. Modules are installed at a height of 3 meters, and they will substantially increase the humidity retention of the soil, by 30-60%, highlighting the synergy of renewable energy generation, sustainable development and ecological recovery of land.

    Huasun was selected as the supplier due to the high reliability of its heterojunction solar modules, which are built with UV protection film and edge sealing. These features ensure excellent performance in the desert climate at the project site. The modules’ high bifaciality and conversion efficiency maximize the region’s abundant sunlight, ensuring reliable and efficient power generation. Additionally, Huasun’s substantial production capacity of 20 GW in total enabled the company to deliver 1.8 GW of its Himalaya G12-132 modules within just three months.

    This achievement showcases the remarkable “Huasun Speed” and reinforces the company’s leadership in manufacturing heterojunction solar modules to the highest standards. It also highlights the pivotal role HJT technology plays in achieving the lowest possible LCOE for large-scale PV plants, already making an impact in 2024.

    Contact Huasun Energy

    Website: www.huasunsolar.com

    Email: sales@huasunsolar.com

    Follow “Huasun HJT” on LinkedIn for more heterojunction and solar updates.

    Photo – https://mma.prnewswire.com/media/2497437/image.jpg
    Logo – https://mma.prnewswire.com/media/2393329/Huasun_Logo.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/huasun-delivers-1-8-gw-of-hjt-modules-within-3-months-for-massive-solar-project-in-northwest-china-302239353.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Nitinotes Announces Weill Cornell Medicine and NewYork-Presbyterian/Weill Cornell Medical Center Clinical Site Activation in the EASE™ IDE Trial

    August 11, 2026

    Neurolief Expands Veterans’ Access to Prescription Neuromodulation for Depression and Migraine Through New VA Contract

    August 11, 2026

    WEKA and Andromeda Partner to Power AI Workloads at Global Scale

    July 30, 2026

    Continuity Biosciences Appoints Vicky Papoutsis to Board of Directors

    July 30, 2026

    Nitinotes Announces First Study Procedures at Orlando Health in the EASE™ IDE Trial

    July 28, 2026

    WEKA Debuts NeuralMesh 6 to Power Enterprise and Agentic AI Workloads at Production Scale

    July 21, 2026
    Latest News

    Magnitude 5.4 quake hits Gilgit-Baltistan near Sost

    August 14, 2026

    GILGIT-BALTISTAN / RankWire.AI / – A magnitude 5.4 earthquake struck northeastern Pakistan early Thursday, sending…

    South Korea car exports set July high at $6.24 billion

    August 14, 2026

    Total eclipse tracks across Russia, Iceland and Spain

    August 13, 2026

    UN marks International Youth Day with youth investment call

    August 13, 2026

    Etihad adds nonstop Abu Dhabi Gothenburg winter flights

    August 13, 2026

    Japan launches Michibiki No. 7 satellite aboard H3 rocket

    August 12, 2026

    Social media addiction suits advance against Meta, peers

    August 12, 2026

    Diesel prices climb amid tight US and European fuel supply

    August 12, 2026
    © 2026 Jewish Sentinel | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.